Cambridge Mosque
The Cambridge Central Mosque cost £23 million to build and is dedicated to the spiritual and social welfare of the city’s estimated six thousand Muslims
View case studyOur dedicated site surveying team are able to join you on site to review current challenges of an existing system.
Meet with our specialist site surveying team and tap into their industry wide knowledge.
Using the latest cutting-edge technology, TaperedPlus can assist in initial off-site budget, on-site simple & even the most complex surveys quickly and accurately
Our team will assist you by reviewing current limitations and restrictions and create a system using our wide range of products to overcome your problems.
TaperedPlus as a leading independent company, partners with many premium insulation manufacturers to provide a range of solutions for your projects.
View our productsThe Cambridge Central Mosque cost £23 million to build and is dedicated to the spiritual and social welfare of the city’s estimated six thousand Muslims
View case studyThe first ever residential square in Birmingham’s creative quarter. The historic Harrison Drape building has been renovated and renamed Fabrick Square. It contains apartments and retail units
View case studyOur Team were delighted to have assisted in the designing and supply of a Tapered tissue faced PIR scheme to the F1 Mercedes AMG Operations Centre
View case study